40G Certifier - PL1, PL2, CP1 and PL3
Knowledge Base - Solution
What do the PL1, PL2, CP1 and PL3 on the Viavi 40G Certifier ISO FA limits refer to?
These are cabling configuration references. PL1 is a permanent link from patch to patch. PL2 is a permanent link from patch panel to a telecommunications outlet. PL3 is a permanent link from a path panel to a telecommunications outlet through a consolidation point. CP1 is a CP link from a patch panel to a consolidation point.