MTS/TBERD 5800 Samcomplete Confgured Amounts when checking RFC 2544 selection
Knowledge Base - FAQ
How is the Configured load calculated when I check the Throughput (RFC 2544) box on the Select Y.1564 Tests setup screen?
When you enable the Optional Measurement for Throughout RFC 2544, within Samcomplete, the unit will add up the CIR of streams 2 thru X (with X being the final stream) and then subtract that amount from the amount specified in the RFC Throughput box. That remaining amount will be assigned to Steam 1 as its load.